View ProjectA 12-story federal office tower required full mechanical insulation across HVAC, plumbing, and equipment systems during a fast-tracked tenant fit-out. The schedule allowed only six weeks for our portion of the work, in coordination with three other trades on the same floors.
El Dorado deployed two crews working staggered shifts, completed the install ahead of schedule, and delivered the project under budget — with a clean punch list at final inspection.
Project delivered 4 days ahead of the published schedule with a final cost 3% under the contracted budget. Post-occupancy energy modeling showed a measurable reduction in cooling load, attributed in part to the upgraded chilled-water insulation envelope.
The owner has since engaged El Dorado for two follow-on packages on adjacent buildings.
Specialty insulation and protective jacketing for pharmaceutical production.
View Project200,000 LF of chilled water piping with elastomeric foam insulation.
View Project